TOTAL E&P UGANDA B.V (COMPANY) in its capacity as Operator of Contract Area (CA) 1 and License Area (LA) 2, in
conjunction with its Joint Venture partner(s), invites experienced and reputable insurers to express interest to be the insurer
of the Tilenga Project, Lake Albert Basin in the Republic of Uganda.
General Field Development Description:
The Tilenga Oil and associated gas development is located in the northern area of Lake Albert, Uganda and covers the
fields in CA-1 block and the northern part of LA-2 block (Tilenga Project).
The major development surface facilities include the following:
• Well pads (31) and the upstream gathering network.
• The Industrial Area containing temporary facilities and the Central Processing Facility (CPF).
• The associated supporting infrastructure (camps, roads, aerodromes etc.)