[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 23
  • File Size 542.11 KB
  • File Count 1
  • Create Date December 27, 2021
  • Last Updated December 27, 2021

Expression of Interest for the provision of pig signallers

Worley Europe Limited as EPCM Early Services Contractor for EACOP Project invites experienced and reputable Contractors to express their interest in providing Pig Signallers for installation in both Tanzania and Uganda the East African Crude Oil Pipeline (EACOP) Project.

The Republic of Uganda, the Uganda National Oil Company (UNOC), the United Republic of Tanzania and/or Tanzania Petroleum Development Corporation (TPDC), aswell as other international oil companies partaking in the development of Exploration Areas 1, 1A, 2 and Kingfisher Discovery Area in the Albertine Graben in Uganda or their affiliates will participate in the implementation of the EACOP Project (Potential Pipeline Participants).

The EACOP Project development involves the engineering, construction, operation and maintenance of a crude oil export pipeline crossing Uganda and Tanzania and an onshore Marine Terminal in Chongoleani, near Tanga Port in Tanzania.

Interested companies which meet the minimum requirements and have the capacity to provide the goods listed
above should express their interest by sending together with the above listed documents an email to EACOP-supplierinfo@worley.com (Max. Email Size: 20 MBs & All documents must be submitted in the English language) on or before 12 noon London Time, on 7th January 2022.