[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 15
  • File Size 280.50 KB
  • File Count 1
  • Create Date November 28, 2023
  • Last Updated November 28, 2023

China Petroleum Pipeline Engineering Co., Ltd. (hereinafter abbreviated as CPP) as Pipeline, Feederline & Above Ground
Installation Contractor for the East African Crude Oil Pipeline (EACOP) Project invites experienced and reputable contractors to express their interest in providing abrasive tools to  the EACOP project.

The EACOP Project involves the construction and operation of an underground and cross-border pipeline to transport crude oil for export to international markets. The pipeline will run from Kabaale, Hoima District in Uganda to the Chongoleani peninsula near Tanga in Tanzania. The length of the pipeline is 1,443 km, of which 296 km will be in Uganda.

Companies which have the ability, capacity, and resources to implement the activities  should express their interest by sending together with the documents stated in the above section through an email to supplierdata@cpptz.com (Max. Email Size: 20 MBs, all documents must be submitted in the English language) on or before 24:00 hours East African Time (EAT), on 3rd  December 2023.