[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 14
  • File Size 533.37 KB
  • File Count 1
  • Create Date May 21, 2024
  • Last Updated May 21, 2024

Request for EOI for provision of water tanks

China Petroleum Pipeline Engineering Co., Ltd. (hereinafter abbreviated as CPP) as Pipeline, Feederline and Above Ground Installation Contractor for the East African Crude Oil Pipeline (EACOP) Project
invites experienced and reputable Contractors to express their interest in providing water tanks
to the EACOP Project.

The EACOP Project involves the construction and operation of an underground and cross-border pipeline to transport crude oil for export to international markets. The pipeline will run from Kabaale, Hoima District in Uganda to the Chongoleani peninsula near Tanga in Tanzania. The length of the pipeline is 1,443 km, of which 296 km will be in Uganda.

Companies which have the ability, capacity, and resources to implement the activities listed above should express their interest by sending together with the documents stated in the above section through an email to [supplierdata@cpptz.com] (Max. Email Size: 20 MBs, all documents must be submitted in the English language) on or before 24:00 hours East African Time (EAT), on May 25th, 2024. The subject of the email should be “EOI for CPP-PROC-UG-080-0510-COMPANY NAME”. CPP reserves the right not to consider companies
that submit an incorrect email subject and the incorrect format of Questionnaire, Appendix 1, 2 and 3.The format of the required documents and relevant technical requirements which are mentioned in Minimum Requirements should be downloaded from EACOP’s website.